United Airlines 737 Simulator

Client: BFJ Construction

Architect:

Task: C. C. Hunter performed selective demolition and concrete pour-back of 4' thick concrete pads for two simulators. Silent demolition methods were employed due to the sensitive machinery in adjacent rooms. C. C. Hunter also fabricated and erected the steel mezzanine structure that allows access to the interior of the simulator.